Saturday, June 20, 2009

Re: My article on tax exemption and hydropower

June 16, 2009
Dr Prakash Chandra Lohani
Former Finance Minister

Dear Dr Lohani

Good to hear from you. Greetings from Norway.

Thanks a lot for agreeing with my logic on the captioned matter. There is a saying that common sense to one is nonsense to other (depending upon how superficial that person is). I agree with you that we have to keep in trying. With encouragement from people like you I am determined to keep in trying.

With best regards,

Sincerely,
Ratna Sansar Shrestha, FCA
Senior Water Resource Analyst
http:www.ratnasansar.blogspot.com/
________________________________________
From: Prakash Lohani [mailto:prakash_dr@hotmail.com]
Sent: Monday, June 15, 2009 17:22
To: Ratna Sansar Shrestha
Subject: RE: My article on tax exemption and hydropower

Shrestha Jee,

I read your article on tax excemption and hydro power. I agree with your logic . But I know that given the charged political atmosphere in the country common sense is not all that common. But we have to keep on trying.

My best wishes
Prakash Lohani




Prakash Chandra Lohani
Dhumbarahi, Kathmandu, Nepal
Ph. 4431544,4432732
Email: prakash_dr@hotmail.com

Friday, June 19, 2009

Re: Environmental Impact Assessment of west Seti project

June 19, 2009

Dear Dr Kaoru Ogino

Thanks a lot for your encouraging words. I take it that you are not flattering me. By the way I don’t deserve to be called "Dr." as I, simply, not one. I am a management professional who is also incidentally a Fellow Chartered Accountant and a corporate lawyer. I got dragged into the water resource sector by the quirk of fate or a historical incident. Now I am a self taught water resource analyst.

I agree with you that the only important issue here is: how objective, credible and reliable the assessment on environment impacts is. Because it is clear beyond reasonable doubt that the entity that conducted the EIA is not independent and they were doing the study while under conflict of interest.

I hope EIA division (or the responsible entity) in ADB is aware of the fact that the entity conducting EIA for west seti project is not independent.

Thanks for clarifying that ADB is to "review, analyze, and assess the reports "independently" if they are acceptable. In case of ADB, we independently check the EIA prepared by the project owner(s), in accordance with our policy and guidelines at the exit point. In this sense, our argument may be whether the objectiveness of the assessments should be ensured at the entry or exit point."

I do certainly believe that ADB should ensure the objectivity of the report "at the entry"; meaning before ADB invests money in the project.

Ascertainment of the same at "exit point" will be like bolting the stable after the horse has run away.

I wish people in ADB responsible for such studies will join in in this discussion.

With best regards,

Sincerely,


Ratna Sansar Shrestha, FCA
Senior Water Resource Analyst
http:www.ratnasansar.blogspot.com/
________________________________________
From: kogino@adb.org [mailto:kogino@adb.org]
Sent: Friday, June 19, 2009 8:17
To: rsansar@mos.com.np
Subject: Re: Fw: Environmental Impact Assessment of west Seti project

Dear Dr. Shrestha,

I appreciate having your comments on the EIA process.

You are very professional and familiar with the matter.

While the interpretation of "assessment" and "independence" may make our slight different views on the process, I trust we are in the same line and objective. The matter is how we get objective, credible and relaible assessment on environment impacts.

The report can be prepared by the project owner(s) or any other independent person(s). The important thing is how we accept it; the Government and ADB review, analyze, and assess the reports "independently" if they are acceptable. In case of ADB, we independently check the EIA prepared by the project owner(s), in accordance with our policy and guidelines at the exit point. In this sense, our argument may be whether the objectiveness of the assessments should be ensured at the entry or exit point.

I hope that you trust our independent position on the EIA in this regard.

Best regards,
Kaoru Ogino

Wednesday, June 17, 2009

Re: Environmental Impact Assessment of west Seti project

June 17, 2009

Kaoru Ogino
Senior Energy Specialist
South Asia Energy Division
Asian Development Bank


Dear Dr Kaoru Ogino

Thanks a lot for reverting back to me so promptly. I also thank you for patiently explaining to me why an EIA is undertaken. I am indeed familiar with this aspect of the "assessment."

However, the point that I am raising is: a study report as such will be reliable/credible only if it is conducted by an independent entity, which is not the case here. This could be resolved either by establishing that WSHL is an independent entity with respect to the study referred to here or by confirming that there is no need for an independent entity to conduct such a study.

With best regards,

Sincerely,
Ratna Sansar Shrestha, FCA
Senior Water Resource Analyst
http:www.ratnasansar.blogspot.com/
________________________________________
From: kogino@adb.org [mailto:kogino@adb.org]
Sent: Tuesday, June 16, 2009 16:01
To: rsansar@mos.com.np
Subject: Fw: Environmental Impact Assessment

Dear Mr. Shrestha,

This refers to your email note addressed to Mr. Senga on 15 June 2009.
Since I am responsible for the project, I would like to explain about the EIA.

Under ADB's operations, EIA reports are undertaken and reviewed to ensure that (i) all environmental impacts are properly addressed, (ii) potential problems are avoided and/or reduced with appropriate mitigation measures, and (iii) development initiatives and their benefits are sustainable.

These points need to be ensured by the project owners (i.e., any private or public entities) for project preparation and implementation which are their responsibility and accountability.
To ensure objectiveness of the assessment, any EIA reports are analyzed and reviewed by the relevant government environmental agency, and formal approval is provided only after ensuring full compliance with its applicable environmental laws, regulations and procedures. The ADB's role is to further ensure compliance with its Environment Policy independetly as well.

I hope this will be helpful.
I appreciate your kind support

Best regards,

Kaoru Ogino
Senior Energy Specialist
South Asia Energy Division
Asian Development Bank
Tel +63 2 632 6211

Monday, June 15, 2009

EIA of West Seti Proejct

June 15, 2009

Mr Kunio Senga
DG, South Asia Dept.
Asian Development Bank
Dear Mr. Senga

Recently I became involved in a discussion about the credibility and reliability of the EIA reports and it was pointed out that such studies should be conducted by an "independent" entity or at least should be conducted by someone whose independence isn’t impaired vis-à-vis the particular project.

This reminded me that all such studies related to west Seti project was "Prepared by West Seti Hydro Limited (WSHL) for the Asian Development Bank." This is clear case of the study being done by an interested party (not by an independent entity). I am sure that you are aware that WSHL is the proponent of this project and they are "working" to develop the project. Under such circumstance, none of the study reports are acceptable.

I trust ADB will take this factor too into consideration prior to deciding to go ahead with the project and get GoN too involved in it.

With best regards,

Sincerely,
Ratna Sansar Shrestha, FCA
Senior Water Resource Analyst
http:www.ratnasansar.blogspot.com/
PO Box 12058, Kathmandu
Telephone: +977 1 435-4698
Telephone/Facsimile: +977 1 435-1946

Tuesday, June 2, 2009

जलबिद्युत विकासको लागि कर राजश्व छूटबाट राष्ट्रहित कति ?

मांग अनुसार बिद्युत आपूर्ति नहुनाले नेपाली उपभोक्ता लोड सेिडंगको मारमा परेकाछन् । आपूर्ति हुन नसक्नुको मुख्य कारण नैं आवश्यकता अनुरुप नयां आयोजनाहरु निर्माण भएर थप बिजुली उत्पादन नहुनु हो । अनि नयां आयोजनाहरुको निर्माण नहुनाको कारण खोतल्दै जांदा शान्ती सुरक्षा लगायतका लगानिमैत्री वातावरणको अभाव नैं प्रमुख देखापर्दछ । यस्तोमा लगानिमैत्री वातावरण प्रबद्र्धन गर्न भनेर स्वतंत्र उर्जा उत्पादकहरुको संघले हालै बिभिन्न कर राजश्वबाट जलबिद्युत आयोजनाहरुलाई मुक्त राख्न आग्रह गरेकाछन् । तसर्थ प्रस्तुत लेखमा यस सम्बन्धमा बिगतको अनुभव र यस्तो उन्मुक्तिको उपादेयता र औचित्यको सम्बन्धमा विष्लेशन गर्ने प्रयास गरिएकोछ ।

निजी क्षेत्र र जलबिद्युत विकास
सबै प्रकारका पूर्वाधारका साथै जलबिद्युत आयोजनाको पनि कार्यान्वयन सरकारको तर्फबाट गिरंदै आएकोमा "अरुण तेश्रो ४०२ मेगावाट र काली गण्डकी १०० मेगावाट आयोजनाहरु कार्यान्वयनको लागि ७-१२ वर्ष सम्म लाग्ने देखिएको" र यी "आयोजनाहरु पूर्ण भै उत्पादनमा नआए सम्म मध्यावधि आवश्यकता पूरा गर्न बैकल्पिक व्यवस्था" गर्न उद्देश्यले २०४९ सालमा जलबिद्युत विकास नीति २०४९ निर्माण गरियो । यो नीति कार्यान्वयन गर्न बिद्युत ऐन २०४९ पनि जारी भयो ।

बिद्युत ऐन २०४९
१ मेगावाट सम्मका आयोजनाले रोयल्टी बुझाउनु नपर्ने व्यवस्था यस ऐनको दफा ११ मा गरकोछ भने दफा १२(१)ले आयकर पनि नलाग्ने व्यवस्था गरेकोछ । दफा १२ को उपदफा ३ मा उत्पादन शुरु भएको १५ वर्ष सम्म आयकर छूट पाउने व्यवस्था छ भने उपदफा २ अनुसार उत्पादन शुरु भएको १५ वर्ष पछि प्रचलित कानून बमोजिम लाग्ने कर्पोरेट आयकर भन्दा १० प्रतिशत कम मात्र आयकर लाग्छ ।

यस्तै दफा १२(७) मा नेपालमा उत्पादन नहुने सामानहरु आयात गरेमा १ प्रतिशत मात्र भन्सार महशूल लाग्ने र आयात इजाजतपत्र दस्तूर बिक्रीकर आदि नलाग्ने व्यवस्था गरेकोछ । बिक्रीकरलाई विस्थापन गर्ने गरेर २०५२ सालमा लागू गरिएको मूल्य अभिबृद्धि कर पनि आयातमा नलाग्ने व्यवस्थाले निरन्तरता पायो ।

आयकर र मूल्य अभिबृद्धि कर
तर २०५८ सालमा जारी भएको आयकर ऐनले भने अन्य ऐन अन्तर्गत आयकर छूट हुने व्यवस्था वातिल गरेर आयकर वाध्यात्मक रुपमा सबैले तिर्नै पर्ने गर्यो । त्यस्तै आर्थिक ऐन २०६३ ले २२० किलोभोल्ट भन्दा उच्च बिद्युत प्रवाहमा र ३ मेगावाट भन्दा ठूला आयोजनाको लागि गरिने पैठारीमा मूल्य अभिबृद्धि कर छूट नहुने व्यवस्था गर्यो । अनि आर्थिक ऐन २०६४ ले २२० किलोभोल्ट भन्दा उच्च बिद्युत प्रवाहमा मूल्य अभिबृद्धि कर लाग्ने व्यवस्था हटायो भने २०६५ मा आएर जलबिद्युत आयोजना सम्बन्धमा लाग्ने मूल्य अभिबृद्धि कर पुनः हटायो ।

कर राजश्व छूटको प्रभाव
आयोजना निमार्णको लागि आयात गरिने आवश्यक मेशिनरी उपकरण औजार आदिमा लाग्ने भंसार महशूल मूल्य अभिबृद्धि कर जस्ता पैठारी महशूल छूट दिनाले आयोजनाको निर्माण लागत घट्दछ र यस्तो आयोजनाबाट उत्पादन हुने बिजुलीको उत्पादन लागत पनि स्वभावतः कम हुन्छ । यसरी पैठारी महशूल छूट दिनाले राज्यको कोषले कर राजश्व गुमाएतापनि उत्पादित बिजुलीको लागत सस्तो हुने हुनाले उपभोक्ताले सस्तो बिजुली उपभोग गर्ने अवसर पाउने हुन्छ र यसबाट अन्ततः मुलुककै अर्थतन्त्र लाभान्वित हुन्छ । यस्तै आयकर छूट दिनाले पनि व्यावसायिकरुपमा पोषाउने गरेर आयोजना संचालनार्थ आवश्यक हुने बिद्युत महशूल दर कम भएपनि पुग्ने हुनाले राज्यले आयकर राजश्व गुमाएपनि मुलुकमा सस्तो दरमा बिजुली उपलब्ध हुन्छ । सुपथ दरमा बिजुली प्राप्त हुंदा मुलुक द्रुत गतीले औद्योकिकरण हुन सक्नाले ठूलो परिमाणमा रोजगारी श्रृजना भएर मुलुकको अर्थतन्त्रलाई नैं लाभ पुग्छ । अर्थात जलबिद्युत आयोजना निर्माण गरिएर मुलुक भित्र उपयोग गर्नाले मुलुकमा आर्थिक कृयाकलापमा अभिबृद्धि भई नेपालको अर्थतन्त्र नैं लाभान्वित हुन्छ । समग्रमा यसरी भंसार महशूल मूल्य अभिबृद्धि कर आयकर आदि छूट दिइनाले राज्यको कोषले गुमाएपनि नेपालको अर्थतन्त्र लाभान्वित हुन्छ राजश्व प्राप्त भई हुने लाभ भन्दा धेरै गुणा बढी अर्थतन्त्रले प्राप्त गर्छ ।

तर निकासीमूलक आयोजनाको हकमा यसरी भंसार महशूल मूल्य अभिबृद्धि कर आयकर आदि छूट िदंदा नेपालको अर्थतन्त्रले एकातिर मेशिनरी उपकरण औजार आदिमा लाग्ने भंसार महशूल मूल्य अभिबृद्धि कर अनि आयोजनाको मुनाफामा लाग्ने आयकर आदि बाट प्राप्त हुने राजश्व गुमाउंदछ भने नेपाली उपभोक्ताले समेत यस्ता सस्ता आयोजनाबाट उत्पादित सस्तो बिजुली उपयोग गर्ने अवसरबाट बंचित हुन्छ र मुलुकको औद्योकिकरण हुन नसक्नाले द्रुत गतिमा रोजगारी श्रृजना भएर अर्थतन्त्रमा आर्थिक कृयाकलापमा अभिबृद्धि भइ देश लाभान्वित हुने अवसरबाट पनि बंचित हुन्छ । अर्थात निकासीमूलक आयोजनाको हकमा देशले कर राजश्व र अर्थतन्त्रमा आर्थिक कृयाकलापमा अभिबृद्धि गर्ने अवसर दुवैबाट बंचित भएर नेपालको अर्थतन्त्रले दोहरै गुमाउंदछ ।

तसर्थ पैठारीमा लाग्ने भंसार महशूल मूल्य अभिबृद्धि कर अनि आयोजनाको मुनाफामा लाग्ने आयकर छूटको सुबिधा नेपाल भित्र बिजुली खपत गरिने जलबिद्युत आयोजनाको हकमा मात्र प्रदान गर्ने र निकासीमूलक आयोजनाले नपाउने व्यवस्था गर्न वान्छनिय छ ।

औद्योगिकरणमा छूटको नकारात्मक प्रभाव
पैठारी महशूल छूट हुंदा बिदेशी सामान नेपालमा सस्तो पर्न आउनाले यस्ता सामान नेपालमा नैं उत्पादन गर्न कलकारखाना स्थापना सम्भावना न्यून हुन्छ । जसले गर्दा यी सामानको लागि नेपालका परनिर्भरताले निरन्तरता पाउंछ । तर छूटको व्यवस्था तयारी सामानलाई नदिएर आवश्यक कच्चा पदार्थमा दिने हो भने यस्ता सामान उत्पादन गर्ने कलकारखाना नेपालमा नैं स्थापना भएर रोजगारी श्रृजनामा समेत टेवा पुग्दछ । तसर्थ पैठारी महशूल छूट नेपालमा बिजुली खपत गर्ने गरेर निर्माण हुने आयोजनालाई मात्र दिनुपर्छ भने निकासीमूलक आयोजनाको हकमा नेपालमा कलकारखाना स्थापना गरेर उत्पादन गर्ने प्रयोजनको लागि हो भने कच्चा पदार्थमा मात्र दिइने व्यवस्था हुनुपर्छ ।

आयकर छूट र बैदेशिक लगािन
आयोजनाहरुलाई आयकर छूट िदंदा राज्यको कोष आयकर राजश्वबाट बंचित भएतापनि स्थानिय लगानिकर्ताद्वारा प्रबद्र्धित आयोजनाको हकमा यी स्थानिय लगानिकर्ता लाभान्वित हुने र नेपालमा पूंजी निर्माणमा समेत सघाउ पुग्दछ । अर्थात राज्यले आयकर राजश्व गुमाएपनि स्थानिय लगानिले निर्मित आयोजनालाई आयकर छूट िदंदा नेपालमा पूंजी निर्माण भएर अर्थतन्त्र लाभान्वित नैं हुन्छ । तर बिदेशी लगानिकताद्वारा प्रबद्र्धित आयोजनाले आयकर छूट पाएको अवस्थामा राज्यले आयकर राजश्व मात्र नगुमाएर अर्थतन्त्र पनि पूंजी निर्माणबाट लाभान्वित हुने मौकाबाट बंचित हुन्छ ।

निष्कर्श
संक्षेपमा स्थानिय लगानिकर्ताद्वारा प्रबद्र्धित आयोजनालाई आयकर तथा पैठारी महसूल छूट िदंदा राज्यले राजश्वको श्रोत गुमाए पनि अर्थतन्त्र भने लाभान्वित भएकै हुन्छ । तर बिदेशी लगानिकर्ताद्वारा प्रबद्र्धित आयोजनाको हकमा यी छूटहरु िदंदा राज्यले राजश्व गुमाउनाको अलावा अर्थतन्त्रले पनि गुमांदछ । तसर्थ स्थानिय लगानिकर्ताद्वारा प्रबद्र्धित आयोजना र बिदेशी लगानिकर्ताद्वारा प्रबद्र्धित आयोजनाको सम्बधमा यी छूटहरु सम्बन्धमा छुट्टाछुट्टै व्यवस्था गर्न वान्छनिय छ । त्यस्तै नेपाल भित्र बिजुली खपत हुने आयोजनालाई यी छूटहरु िदंदा नेपाल सरकारले राजश्व गुमाएपनि नेपालमा सस्तो बिजुली खपतबाट लाभान्विन हुन्छ । तर निकासीमूलक आयोजनालाई यस्ता छूट िदंदा सरकारले राजश्व गुमाउनाका साथै सुपथ मूल्यमा बिजुली खपत गर्ने मौकाबाट समेत बंचित हुनाले नेपालले दोहरै गुमाउने हुन्छ । तसर्थ निकासीमूलक आयोजना वा बैदेशिक लगानिबाट निर्मित आयोजनालाई यस्ता छूटहरु िदंदा राष्ट्रियहित नगन्यरुपमा मात्र हुन्छ भने नेपालमा बिजुली खपत हुने गरेर निर्माण हुने आयोजना र स्थानिय लगानिबाट निर्मित आयोजनालाई यी छूट िदंदा समग्रमा नेपाली अर्थतन्त्र लाभान्वित हुन्छ र यस्तो उन्मुक्तिको मात्र उपादेयता र औचित्य हुन्छ ।

२०६६ ज्येष्ठ १९ गतेको गोरखापत्रमा प्रकाशित